TPM (Total Preventive Maintenance)

Acara

20 – 21 Februari 2017 | 08.00 – 16.00 | Rp 4.000.000 di Jakarta
29 – 30 Maret 2017 | 08.00 – 16.00 | Rp 4.000.000 di Jakarta
05 – 06 April 2017 | 08.00 – 16.00 | Rp 4.000.000 di Jakarta
08 – 09 Mei 2017 | 08.00 – 16.00 | Rp 4.000.000 di Jakarta

Jadwal Selanjutnya …




Objectives

TPM is a process to maximize the productivity of your equipment for its entire life and will extend the life of the equipment. TPM fosters an environment where improvement efforts in Safety, Quality, Delivery, Cost and Creativity are encouraged, through the participation of all employees. The goal of TPM is to maximize your Overall Equipment Effectiveness (OEE) and to reduce equipment downtime while improving quality and capacity.

This workshop is designed to show that Total Productive Maintenance goes far beyond traditional maintenance boundaries to attack equipment-related waste, including: downtime, speed losses, defects, frequent adjustments, changeover, and breakdowns. Participants are provided with the twelve steps in preparatory and implementation stage of TPM.



Other Benefits:

By attending this workshop, participants also obtain the following benefits:

  • Understand TPM and its major components, including how to measure and increase overall equipment effectiveness and how TPM can help avoid interruptions to production
  • Explain how the TPM process is integrated with other Lean tools to increase productivity
  • Gather and analyze Overall Equipment Effectiveness data to determine equipment constraints
  • Identify the six major equipment-related losses and how to minimize them in order to increase OEE
  • Learn how implementation of the TPM process fosters improvement efforts in safety, quality, delivery, cost, and creativity by all employees



Agenda Training TPM

  1. Introduction / Background
    • Workshop objectives
    • Manager roles and functions.
  2. What is Total Productive Maintenance (TPM)
  3. The Benefits of TPM (Tangible and Intangible Benefits)
  4. The Twelve Six Steps in TPM Preparation
  5. The Six Step TPM Implementation Stage
  6. The Seven Levels of Autonomous Maintenance
  7. Measuring Overall Equipment Effectiveness
    • Availability
    • Performance Efficiency
    • Quality Rate
    • OEE Calculation for a Single Machine
    • Calculating a Line or Process OEE Number
    • Accounting for Quality Losses
    • Plant OEE Calculation
    • Corporate or Division OEE Measures
    • Showing the Results of OEE
    • The Power of OEE.
  8. Closing (Summary and Conclusion).



Who Should Attend

Personnel/supervisor/manager from production, maintenance, engineering and quality department.

Jadwal Training 

  • 20 – 21 Februari 2017
  • 29 – 30 Maret 2017
  • 05 – 06 April 2017
  • 08 – 09 Mei 2017
  • 03 – 04 Juli 2017
  • 28 – 29 Agustus 2017
  • 18 – 19 September 2017
  • 23 – 24 Oktober 2017
  • 22 – 23 November 2017
  • 13 – 14 Desember 2017

 

Time      : 08.00 – 16.00



Biaya Pelatihan Public

  • Rp 4.000.000,-(Empat Juta Rupiah).
  • Biaya tersebut sudah termasuk Fee Instruktur, Penggandaan Materi Training TPM, Training Kit, 2X Coffee Break, Lunch, dan Sertifikat.  Tidak termasuk pajak-pajak.

 

TPM (Total Preventive Maintenance)

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
 

cforms contact form by delicious:days

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • TwitThis
  • Facebook
  • LinkedIn
  • Google Bookmarks
  • Y!GG
  • Digg
  • del.icio.us
  • StumbleUpon
  • Reddit
  • MySpace
  • Technorati
  • YahooMyWeb
  • YahooBuzz

Leave a Reply

Your email address will not be published. Required fields are marked *