CHILLER AND COOLING TOWER

Acara

25 – 27 Juli 2016 | Rp 6.500.000 at Bandung
22 – 24 Agustus 2016 | Rp 6.500.000 at Bandung
26 – 28 September 2016 | Rp 6.500.000 at Bandung
24 – 26 Oktober 2016 | Rp 6.500.000 at Bandung

Jadwal Selanjutnya …

 

 

INTRODUCTION:

Chiller and cooling tower are used in HVAC, power plant and refrigeration system. Design and operation of the equipments are very important to know for an engineer. This course covers the fundamentals and practical applications for understanding of design and operation of the chiller and cooling tower. The comprehensive coverage of the basic theory, system analysis, optimization concept, and calculation methods to make this the most complete course available today in achieving an economical system.



TRAINING BENEFITS:

Enable to analyze and recommend the most effective solution available in operation and design for chiller and cooling tower. Enable to utilize energy as possible as saving for chiller and cooling tower system. Familiar and better understanding of all aspects relating to efficient chiller and cooling tower in commercial application.



WHO SHOULD ATTEND THIS TRAINING?:

  1. Technicians
  2. ME engineers
  3. and other who responsible for selecting, mechanical equipments

MATERIAL OUTLINE  CHILLER AND COOLING TOWER:

  1. Chiller System and Basics
    1. Work Principle of Chiller
    2. Piping Basics
    3. Pumping Basics
    4. Control Valve Basics
    5. Loop Control Basics
    6. Air-Cooled Chillers
    7. Water-Cooled Chillers
    8. Piping and Diversity
  2. Chiller Construction and Safety
    1. Dual Compressor Chillers
    2. VFD Chillers
    3. System Design Changes
    4. Mechanical Room Safety Standard
    5. Single Chiller System
  3. Basic Operation and Arrangement of Chiller
    1. Basic Components
    2. Series Chillers System
    3. Single Chiller Sequence of Operation
    4. Parallel Chiller System
    5. Parallel Chiller Sequence of Operation
    6. Series Counterflow Chillers
    7. Using VFD Chillers in Series Arrangements
    8. System Comparison
    9. Very Large Chiller Plants
    10. Primary/Secondary Sequence of Operation
  4. Chiller Cooling System
    1. Water-Side Free Cooling
    2. Direct Waterside Free Cooling
    3. Parallel Waterside Free Cooling
    4. Series Waterside Free Cooling
    5. Waterside Free Cooling Design Approach
    6. Waterside Free Cooling Sequence of Operation
    7. Chilled Water Volume
    8. Chilled Water Temperatures and Ranges
    9. Minimum Chilled Water Volume
    10. Estimating System Volume
    11. Evaluating System Volume
  5. Cooling Tower
    1. Cooling Tower Types and Cooling Tower Systems
    2. General Design Consideration
    3. Cooling Tower Construction and Installation Requirements
    4. Tower materials
    5. Cooling Tower Design and Operation Consideration
    6. Cooling Tower Water and Bleed-off Water Control
    7. Improving Energy Efficiency of Cooling Towers
  6. Hybrid Plants and Energy Saving
    1. Heat Recovery and Templifiers
    2. Load Profiles
    3. Heat Recovery Chillers
    4. Variable Primary Flow Design
    5. Variable Primary Flow Sequence of Operation
    6. Low Delta T Syndrome
    7. Low Delta T Example
    8. Low Delta T Syndrome Causes and Solutions



INSTRUCTOR :  

DR. Ir. I Made Astina, M.Eng.  and Team

DR. Ir. I Made Astina, M.Eng. is currently assistant professor of mechanical Engineering, Faculty of Mechanical and Aerospace Engineering ITB. He graduated from Mechanical Engineering Department ITB in 1992. Prior to his Ph.D. obtainment in Engineering (thermodynamics, school of science for open and environmental systems) from Keio University Tokyo, Japan in 2004, he received Master of Science in Engineering (mechanical engineering department) from the same university in 1997. His researches concern on thermodynamic, development of new thermal systems, thermodynamic cycles, air conditioning and refrigeration systems. His papers were published in international and national journals, besides he also presents his papers in international and national seminars. Besides teaching at the university, he also has experiences to give short courses for industrial practical engineers and publics and to collaborate practical consultant works.

 



VENUE :  

Bandung (Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)



TRAINING DURATION :  

3 days

TRAINING TIME  :

  1. 25 Jul 2016-27 Jul 2016
  2. 22 Aug 2016-24 Aug 2016
  3. 26 Sep 2016-28 Sep 2016
  4. 24 Oct 2016-26 Oct 2016
  5. 14 Nov 2016-16 Nov 2016
  6. 19 Dec 2016-21 Dec 2016

INVESTATION PRICE :

  1. Rp 6.500.000/Person (full fare) or
  2. Rp 6.250.000/Person (Early Bird, payment 1 week before training) or
  3. Rp 5.950.000/person (group, there is 3 or more participants from the same company)


FACILITIES FOR PARTICIPANTS:

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with full AC facilities and multimedia
  9. Lunch and twice coffeebreak everyday of training
  10. Qualified instructor
  11. Transportation for participants from hotel of participants to/from hotel of training (if minimal number of participants from one company is 4 persons)

 

CHILLER AND COOLING TOWER

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
 

cforms contact form by delicious:days

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • TwitThis
  • Facebook
  • LinkedIn
  • Google Bookmarks
  • Y!GG
  • Digg
  • del.icio.us
  • StumbleUpon
  • Reddit
  • MySpace
  • Technorati
  • YahooMyWeb
  • YahooBuzz

Leave a Reply

Your email address will not be published. Required fields are marked *