Butuh Training?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 14.000 topik dan 300.000 event sepanjang tahun 2023

PRACTICAL DRILLING SKILLS

ACARA

11 – 13 Maret 2020 | Rp 7.950.000/ peserta di Bandung
01 – 03 April 2020 | Rp 7.950.000/ peserta di Bandung
18 – 20 Mei 2020 | Rp 7.950.000/ peserta di Bandung

Jadwal Training 2020 Selanjutnya …

 

 

PRACTICAL DRILLING SKILLS TRAINING DESCRIPTION

This course takes that learning and brings it back to the classroom. The techniques will be presented in such a manner that participants should be able to immediately apply the technology upon returning to the drilling rig. Computers do a wonderful job of calculating numbers if equations are correct and the input data is available. Unfortunately, many variables associated with drilling rigs remain unknown and not predictable. This course teaches how to listen to the well, perform simple tests on the rig, and make proper decisions unique to each well. The overbalanced pressure at the bottom of a borehole controls many aspects of drilling. A mud logger’s gas units can reveal much information but is usually not understood. The mud logger’s gas unit curve can be calibrated to reveal how much gas is in the drilling fluid. The flow in the drill string and annulus is partially laminar and partially turbulent depending greatly upon the flow rate and the rheological properties of the drilling fluid. This controls the nozzle sizes required to cause the drilling fluid to strike the bottom of the hole with the greatest force or greatest power. Unfortunately, this flow regime cannot be predicted prior to drilling. A procedure is presented which allows proper nozzle sizes to be installed in the drill bit and determine the correct optimum flow rate. The correct yield point can then be predicted which will lift cuttings through the vertical part of a wellbore. When the new bit with the correct nozzles returns to drilling, the flounder point of either a roller cone bit or a PDC bit can be determined. This allows the cheapest, fastest hole to be drilled. Well bore instability and erosion will be discussed from an understanding of clay structure and field data. Considerable attention is devoted to correcting drilling fluid properties and controlling filter cake quality. This eliminates many seen and unseen obstacles for drilling a trouble-free hole as cheaply as possible. This involves proper drilling fluid processing in the surface tanks.

 

DESIGNED FOR

Experienced people on drilling rigs who want to drill cheaper, specifically drilling rig personnel, drilling engineers, drilling rig supervisors, tool pushers, drilling managers, and service company personnel. This course is not recommended for inexperienced personnel or people not directly involved with actual drilling operations. You should have completed the Basic Drilling Technology course or have several years of drilling experience to gain the most from the course.

 

YOU WILL LEARN

Participants will learn how to:

  1. Calibrate a mud logger’s gas unit curve
  2. Interpret gas unit curves
  3. Determine pore pressure
  4. Select the correct nozzle sizes and flow rate to make the fluid strike the bottom of the hole with the greatest force possible or the greatest power available
  5. Select drilling fluid yield point needed to clean the vertical portion of the well
  6. Extend the life of drill bits and have the maximum drilling rate by determining the flounder point of a roller cone or PDC bit
  7. Avoid poor cementing jobs by creating a thin, slick, compressible filter cake
  8. Decrease vibration which seriously impacts PDC bit performance by eliminating drilled solids
  9. Arrange equipment for a proper PIT
  10. Read Pressure Integrity charts
  11. Evaluate dull bits to select the best next bit
  12. Understand well bore instability

 

PRACTICAL DRILLING SKILLS TRAINING MATERIAL OUTLINE

  1. Interpretation of mud logger gas units
  2. Determining pore pressure
  3. On-site hydraulic optimization
  4. Selecting proper bit loading (weight on bit and rotary speed) for the fastest, cheapest hole
  5. Interpreting pressure integrity tests
  6. Hole problems (such as, stuck pipe, lost circulation, and ballooning)
  7. Borehole stability
  8. Operating guidelines
  9. Drilling fluid properties necessary to maximize drilling performance
  10. Discussion of polymers in drilling fluids
  11. Solids control equipment arrangement to assure best drilled solids removal

 

INSTRUCTOR :  Dr.-Ing. Bonar Tua Halomoan Marbun  and Team

 

VENUE : Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

 

PRACTICAL DRILLING SKILLS TRAINING TRAINING DURATION :  3 days

 

JADWAL TRAINING 2020

  1. 11 Mar 2020-13 Mar 2020
  2. 01 Apr 2020-03 Apr 2020
  3. 18 Mei 2020-20 Mei 2020
  4. 02 Jun 2020-04 Jun 2020
  5. 01 Jul 2020-03 Jul 2020
  6. 03 Agust 2020-05 Agust 2020
  7. 02 Sep 2020-04 Sep 2020
  8. 05 Okt 2020-07 Okt 2020
  9. 02 Nop 2020-04 Nop 2020
  10. 02 Des 2020-04 Des 2020

 

INVESTMENT PRICE/PERSON :

  1. Rp. 7.950.000/person (full fare) or
  2. Rp. 7.750.000/person (early bird, payment 1 week before training) or
  3. Rp. 7.500.000/person (if there are 3 persons or more from the same company)

 

FACILITIES FOR PARTICIPANTS:

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with Full AC facilities and multimedia
  9. Lunch and twice coffeebreak every day of training
  10. Qualified Instructor
  11. Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)

 

PRACTICAL DRILLING SKILLS

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
  14. Captcha
 

cforms contact form by delicious:days