Butuh Training?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 14.000 topik dan 300.000 event sepanjang tahun 2023

DOWNHOLE EQUIPMENT AND PRODUCTION WELL SURFACE

ACARA

08 – 10 April 2014 | IDR  5.800.000 per participant di Yogyakarta
08 – 10 April 2014 | IDR  8.000.000 per participant di Bali
08 – 10 April 2014 | IDR  6.500.000 per participant di Bandung
14 – 16 April 2014 | IDR  5.800.000 per participant di Yogyakarta
14 – 16 April 2014 | IDR  8.000.000 per participant di Bali
14 – 16 April 2014 | IDR  6.500.000 per participant di Bandung

Jadwal Training 2014 Selanjutnya …

 

TRAINING OBJECTIVES DOWNHOLE EQUIPMENT AND PRODUCTION WELL SURFACE

  1. Memahami prinsip-prinsip dasar penggunaan peralatan sumur produksi (well production) di atas maupun di bawah permukaan, untuk lapangan-lapangan minyak dan gas bumi .
  2. Melakukan diagnosis sederhana dalam menagani problema produksi di lapangan yang disebabkan oleh reservoir atau fasilitas produksinya.
  3. Melakukan perhitungan-perhitungan kuantitatip sederhana untuk gas lift, ESP, Hydraulic/Jet Pump, Sucker Rod Pump dan PCP.
  4. Melakukan perhitungan-perhitungan kuantitatip sederhana untuk perancangan dan perancangan ulang separator, gas scrubber, gas dehydrator dan peralatan produksi lainnya.




TRAINING
 OUTLINES PRODUCTION WELL SURFACE AND DOWNHOLE EQUIPMENT

Reservoir Background

  • Exploration
  • Exploitation
  • Reserve Calculation

Basic Production Engineering

  • Inflow Performance Relationship
  • Productivity Index
  • Multiphase Flow

Well Completion System

  • Open Hole Completion
  • Single Completion
  • Commingle Completion
  • Multiple Completion

Downhole Equipments

  • Tubular Device
  • Packer System
  • Circulating Device
  • Nipples
  • Joints

Artificial Lift Method Equipments and Design

  • Gas Lift
  • Submersible Pump
  • Sucker Rod Pump
  • Hydraulic Pump

Surface Handling Facilities

  • Well Equipments
  • Pigging System
  • Separator
  • Gas Scrubber
  • Gas Dehydarator

Gas Processing Facilities

  • Gas Sweetening
  • Heat Exchanger
  • Fractination, Liquification,Refrigeration System

Compressor, Pump, Gas and Oil Piping System

  • Compressor
  • Pumps : Centrifugal, Reciprocating,  Diaphragm
  • Gas and Oil Piping System

 

TRAINING INSTRUCTOR DOWNHOLE EQUIPMENT AND PRODUCTION WELL SURFACE

Dr. Ir. Nursuhacaryo, M.Sc. and team

 

WHO SHOULD ATTEND?

Operator, Senior Operator, Junior Engineer, Non Engineer

 

TRAINING METHOD DOWNHOLE EQUIPMENT AND PRODUCTION WELL SURFACE

Lecturing, workshop, interactive discussion, sharing and case study.

TRAINING TIME & VENUE DOWNHOLE EQUIPMENT AND PRODUCTION WELL SURFACE

  • 8-10 April / 14-16 April /  23-25 April / 28-30 April / 6-8 Mei / 14-16 Mei / 26-28 Mei / 3-5 Juni /  17-19 Juni / 25-27 Juni / 2-4 Juli / 14-16 Juli / 29-31 Juli / 5-7 Agustus / 13-15 Agustus / 27-29 Agustus /3-5 September / 17-19 September / 23-25 September / 1-3 Oktober / 14-16 Oktober / 29-31 Oktober / 4-6 November / 2-14  November / 25-27 November / 2-4 Desember / 9-11 Desember / 16-18 Desember / 22-24 Desember / 29-31 Desember 2014

Hotel Grand Aston – Yogyakarta



TRAINING FACILITIES DOWNHOLE EQUIPMENT AND PRODUCTION WELL SURFACE

  • Training Modul,
  • Exclusive Backpack,
  • Stationeries,
  • Sertifikat Training,
  • Exclusive Polo shirt atau jaket,
  • Flashdisk berisi materi training well surface and downhole equipment,
  • 2x coffee break dan makan siang,
  • Picking-up service dari Bandara ke hotel/training venue (Minimal 2  orang peserta dari perusahaan yang sama).

 

PRODUCTION WELL SURFACE AND DOWNHOLE EQUIPMENT  – Yogyakarta

 

 

Formulir Pra-Pendaftaran Public Training / Permintaan Informasi Lebih Lanjut
  1. JENIS INFORMASI/TRAINING
  2. (required)
  3. (required)
  4. DATA PRIBADI
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. DATA PRE REGISTRATION (Tidak Mengikat)
  12. (required)
  13. PESAN UNTUK PENYELENGGARA TRAINING
  14. Captcha
 

cforms contact form by delicious:days